More programs: For multi-layer PCB boards, the manufacturing process is very lengthy. Therefore, we need more processes to handle them.
Higher cost: The production cost of multi-layer boards is very high, sometimes due to the need for special processes, the cost can be even higher. If any problems arise, rework is required to solve them, which requires more time and money.
Long manufacturing time: It takes a long time to manufacture them. (For reference only: Some manufacturers have more machines, so the time required to manufacture them is shorter.)
mobile phone: 86-15113315665
Contact: Chen Changhai
mobile phone: 86-18676922028
E-mall: haibo_fpcba1668@163.com
Address: 3rd Floor, Building 2, Fuxing Industrial Park, Building B, Chuangye 1st Road, Jiangbian Community, Songgang Street, Bao'an District, Shenzhen